The project pipeline
More than two-thirds of the tracked projects are not operating. Seven are being built, five are proposals, and one is under review.
Every point is tagged by status. Select a project to separate operating capacity from the proposal layer.
A proposed gigawatt is not an operating megawatt. The map’s most important distinction is status - not scale.
More than two-thirds of the tracked projects are not operating. Seven are being built, five are proposals, and one is under review.
Half of all tracked projects are in Alberta. The province contains both the largest proposal and the largest build under construction.
Real capacity is concentrated around Toronto, Montreal, and Calgary.
GW at Wonder Valley - more than twenty times a federal estimate of Canada’s current AI data-centre capacity.
GW requested against an interim connection allowance of roughly 1.2 GW through 2028.
The operating base leans on provincial grids. Much of the Alberta proposal layer avoids the interconnection bottleneck by attaching private generation.
Wonder Valley, Beacon Indus, Bitdeer Fox Creek, AVAX One, and Meta’s Sturgeon County project are designed around on-site natural gas or gas-led supply.
AWS, Vantage, TELUS Rimouski, QScale, and Vantage Quebec City draw on Hydro-Québec’s near-100-percent renewable grid.
The most solid entries are cloud regions and existing campuses - less spectacular than the AI headlines, but already energized.
Filter the dataset, then select any row for its dossier. Capacity is shown only where the source chapter states a figure.
| Project | Place | Status | Capacity | Power | Type |
|---|
The boom is real. Its scale, timing, fuel, and even its “AI” label require qualification.
Operating Canada is measured in hundreds of megawatts. Announced Canada is measured in tens of gigawatts. Putting both on one total produces a number with no operational meaning.
Nine projects are labelled AI campuses, but some are crypto-to-AI pivots. The four cloud regions are the most credible entries partly because they predate the current AI boom.
Alberta developers are responding to a narrow grid door by proposing private gas generation. Several “data-centre” projects are power plants with compute attached.
Synapse near Olds, a hyperscale proposal near Winnipeg, and Steelport in Hamilton show where projects did not survive regulatory or community scrutiny. Rejections reveal the rules of the boom.
The host, analyst, and reporter work through what is operating, what remains a claim, and what powers the proposed build.
Read the original chapter at Zeever.ca ↗
CANADA COMPUTE MAP · DATA SNAPSHOT: JULY 2026 · SOURCE ATTRIBUTION RETAINED