Canada’s data-centre boom, counted honestlySOURCE: ZEEVER.CA ↗
18 tracked builds · July 2026

A boom on paper.
A fraction in service.

Every point is tagged by status. Select a project to separate operating capacity from the proposal layer.

5operating
7under construction
5proposed
1under review
Operating
Under construction
Proposed
Under review
The credibility gap

Count buildings.
Not headlines.

A proposed gigawatt is not an operating megawatt. The map’s most important distinction is status - not scale.

The project pipeline

13 / 18

More than two-thirds of the tracked projects are not operating. Seven are being built, five are proposals, and one is under review.

5 operating7 construction5 proposed1 review

Where the boom sits

9

Half of all tracked projects are in Alberta. The province contains both the largest proposal and the largest build under construction.

Operating metros

3

Real capacity is concentrated around Toronto, Montreal, and Calgary.

Largest proposal

7.5

GW at Wonder Valley - more than twenty times a federal estimate of Canada’s current AI data-centre capacity.

Alberta queue

21

GW requested against an interim connection allowance of roughly 1.2 GW through 2028.

DO NOT ADD THESE
STATUS IS A MEASUREMENT. “ANNOUNCED” IS NOT “OPERATING.”
What keeps the racks on

In Alberta, the map is also a gas map.

The operating base leans on provincial grids. Much of the Alberta proposal layer avoids the interconnection bottleneck by attaching private generation.

On-site generation
GAS

The Alberta workaround

Wonder Valley, Beacon Indus, Bitdeer Fox Creek, AVAX One, and Meta’s Sturgeon County project are designed around on-site natural gas or gas-led supply.

Provincial grid
HYDRO

Quebec’s operating base

AWS, Vantage, TELUS Rimouski, QScale, and Vantage Quebec City draw on Hydro-Québec’s near-100-percent renewable grid.

Mixed and grid-connected
GRID

Cloud before the boom

The most solid entries are cloud regions and existing campuses - less spectacular than the AI headlines, but already energized.

BOTTLENECK
The ledger

Every project.
Every status.

Filter the dataset, then select any row for its dossier. Capacity is shown only where the source chapter states a figure.

ProjectPlaceStatusCapacityPowerType
How to read the boom

Four corrections to the press-release map.

The boom is real. Its scale, timing, fuel, and even its “AI” label require qualification.

01 / STATUS

The unit changes the story.

Operating Canada is measured in hundreds of megawatts. Announced Canada is measured in tens of gigawatts. Putting both on one total produces a number with no operational meaning.

02 / TYPE

“AI” has soft edges.

Nine projects are labelled AI campuses, but some are crypto-to-AI pivots. The four cloud regions are the most credible entries partly because they predate the current AI boom.

03 / POWER

The server is only half the project.

Alberta developers are responding to a narrow grid door by proposing private gas generation. Several “data-centre” projects are power plants with compute attached.

04 / REJECTION

A failed project belongs on the map.

Synapse near Olds, a hyperscale proposal near Winnipeg, and Steelport in Hamilton show where projects did not survive regulatory or community scrutiny. Rejections reveal the rules of the boom.

Four chapters · Three voices

Listen to the map.

The host, analyst, and reporter work through what is operating, what remains a claim, and what powers the proposed build.

Source & method

Built from a reported map - not a press-release total.

This interface is an independent visual interpretation of Colin Smillie’s July 15, 2026 chapter, “Mapping Canada’s Data-Centre Boom.” Project counts, statuses, capacities, and the editorial distinction between announced and operating capacity follow that source.

Read the original chapter at Zeever.ca ↗

Source families cited by the chapter

  • Operator announcements from Meta, eStruxture, Vantage, QScale, TELUS, AWS, Google Cloud, Microsoft, Bitdeer, and O’Leary Ventures.
  • Alberta Major Projects registry; Impact Assessment Agency of Canada; AESO large-load framework.
  • ISED capacity material and National AI Strategy demand estimates.
  • Hydro-Québec, BC Hydro, and IESO grid context.
  • Reporting from Canada’s National Observer, The Narwhal, CBC News, Global News, and Data Center Dynamics.

Reading rules

  1. Tag every entry by current status.
  2. Do not add proposed gigawatts to operating megawatts.
  3. Treat named capacity as a project claim until energized.
  4. Keep rejected and contested projects in view.

CANADA COMPUTE MAP · DATA SNAPSHOT: JULY 2026 · SOURCE ATTRIBUTION RETAINED

Pass it on

Share the map.
Keep the status attached.

Select one of six cards. Every sharing action uses the message from the active card.

1. What is actually on the map0:00 / 0:00